VERHI Events 2026: What We’re Bringing to Global Data Center Infrastructure Shows

Article snapshotCompany News
2 min readEstimated time
0 sectionsWhat’s inside

Why Trade Shows Still Matter for Data Center Decisions

You can read datasheets and watch webinars, but nothing beats putting your hands on a precision air conditioning unit or a UPS cabinet. That's why VERHI events are a regular part of our calendar. We're not just there to hand out brochures. We want to talk about your specific cooling load, your redundancy goals, and the physical constraints of your site.

In 2026, we're focusing on the problems that keep showing up in real projects: rising rack densities, water-side free cooling in warm climates, and the gap between nameplate capacity and actual usable power. Trade shows give us a chance to show how we tackle those issues with modular, serviceable equipment.

Engineers discussing precision air conditioning unit at a trade show booth

What We're Demonstrating at VERHI Events in 2026

We're bringing working units, not just scale models. On the cooling side, that means a look inside our row-based and room-based precision air conditioners. You'll see how we handle sensible heat ratios, airflow distribution, and redundancy options like N+1 fans and dual power feeds.

For power, we're showing UPS systems from 10 kVA up to 200 kVA in a modular frame. The key talking point is efficiency at partial load. A UPS that hits 96% at full load but drops to 88% at 30% load is a liability. We'll show you the efficiency curve, not just the headline number.

We're also bringing a micro-module data center – a self-contained pod with integrated cooling, power distribution, and monitoring. It's a practical answer for edge sites and remote facilities where you can't afford a full custom build.

  • Live demo of a 30 kW precision air conditioner with EC fans and variable speed compressors
  • UPS efficiency curves at 25%, 50%, 75%, and 100% load
  • A walk-through micro-module with a PUE estimate based on your climate
  • Thermal camera images showing hot spots in a mock server rack
Close-up of a UPS control panel showing efficiency data

The Engineering Behind Our Booth Displays

One thing we hear a lot is: 'Why is my cooling system running more than it should?' Often it's because the unit is oversized or the setpoints are wrong. At our events, we walk through the math. For a 10-rack room with 5 kW per rack, your sensible load is around 50 kW. If you pick a 60 kW unit, you're already paying for capacity you don't need.

We also talk about return air temperatures. Most precision units are designed for a 20-25°C return. If you're sending 18°C air, the unit works harder and efficiency drops. Simple changes can cut energy use by 15-20%.

On the UPS side, we discuss battery runtime and how it changes with load. A 100 kVA UPS with a 10-minute battery at full load might give you 25 minutes at 40% load. That's a real planning number, not a marketing figure.

Load UPS Efficiency Cooling Load (kW) PUE Estimate
25% 94.5% 12.5 1.35
50% 96.0% 25 1.28
75% 96.5% 37.5 1.24
100% 96.2% 50 1.26

The table above is illustrative, based on typical VERHI equipment and a moderate climate. Your numbers will vary, but it shows why part-load efficiency matters. We're happy to run the calculation for your site at the booth.

Thermal image of server racks showing hot spots

Where to Find Us: Upcoming VERHI Events

We're confirming our schedule for the second half of 2026. Expect to see us at major infrastructure shows in Europe, the Americas, and Central Asia. Exact dates and booth numbers change, so check our website or contact us directly. We'll post updates as soon as they're locked.

If you're planning to attend, let us know. We can set up a meeting to go deeper on your project – bring your floor plans, load calculations, and climate data. We'll bring the coffee.

Map showing trade show locations in Europe, Americas, and Central Asia

What You Should Ask Us at the Booth

Don't waste your time on generic questions. Here are a few that get to the heart of your decision:

  1. What is the sensible heat ratio of your unit at 50% load and 24°C return air?
  2. How does the UPS efficiency change between 30% and 70% load?
  3. Can the cooling unit operate in free cooling mode down to 10°C outdoor?
  4. What is the maximum altitude derating for your equipment?
  5. How do you handle humidity control in a mixed IT and battery room?

We'll give you straight answers, even if it means saying 'that's not our strength' or 'you don't need that feature.' We'd rather lose a sale than see a system fail in the field.

Handshake between engineer and customer at an expo

How to Get the Most Out of a Trade Show Visit

Trade shows are exhausting. You walk miles, collect bags of swag, and forget half of what you saw. Here's a simple plan:

  1. Write down your top three technical requirements before you arrive
  2. Visit booths that match those requirements first, not the biggest booths
  3. Ask for a specific person who can answer detailed questions, not a sales generalist
  4. Take photos of nameplates and spec sheets, not just the pretty displays
  5. Follow up within a week while the conversation is still fresh

We do the same when we visit suppliers. It keeps us honest and helps us improve our own products.

Beyond the Booth: VERHI Events and Webinars

VERHI Events 2026: What We're Bringing to Global Data Center Infrastructure Shows: data center infrastructure

If you can't travel, we're also running online sessions tied to the shows. These are not sales pitches. We walk through a real design example – say, a 50 kW edge site in a region with high ambient temperatures – and explain our equipment choices step by step.

You'll come away with a clearer idea of how to size cooling and power, how redundancy affects cost, and what PUE you can realistically expect. Past attendees have told us they use our checklists in their own RFPs.

Webinar screen showing a data center design example

The Bottom Line on VERHI Events

We're not at these shows to win awards for the fanciest booth. We're there to help you make better decisions about your data center infrastructure. Whether you're planning a 500 kW facility or a 20 kW edge closet, the fundamentals are the same: match cooling to load, design for part-load efficiency, and build in serviceability.

Come find us. Bring your toughest questions. We'll bring the answers – and maybe a few spare fans.

Frequently Asked Questions

What types of products does VERHI typically showcase at international data center infrastructure events?

At VERHI events, we feature precision air conditioning units (row-based and room-based), UPS systems from 10 to 200 kVA, and micro-module data center solutions. We also demonstrate monitoring and control software that ties cooling and power together.

How can I find out if VERHI is exhibiting at a trade show near me?

The best way is to check our website's events page or contact our sales team directly. We update our schedule as soon as venues and dates are confirmed, and we often post booth numbers a few weeks before each show.

Can I book a meeting with a VERHI engineer at an event?

Absolutely. We encourage it. Just reach out through our contact page and mention which event you're attending. We'll set aside time for a one-on-one discussion about your project, whether it's a new build, a retrofit, or an expansion.

Do you offer online webinars for those who can't attend in person?

Yes. We run live webinars alongside major trade shows. These sessions cover practical design topics, such as sizing cooling for high-density racks or selecting UPS redundancy. You can register through our website, and recordings are available afterwards.

What should I prepare before visiting the VERHI booth?

Bring a rough idea of your cooling load in kW, your power requirements in kVA, and any constraints like floor space or ambient temperature range. If you have a simple floor plan, even better. That way we can give you specific advice on the spot.

Want to meet us at an upcoming event or set up a technical consultation? Get in touch with VERHI today.

V
VERHI Editorial Team
Precision cooling, UPS and data center infrastructure content team
Reviewed by VERHI Technical Editorial Review on 2026-09-05

Content based on VERHI's internal engineering practices, product development processes, and participation in industry events. No external statistics or customer claims are cited.

Information can change. Confirm time-sensitive details with the official provider or your trip/technical advisor before making plans.

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *